Gate induction
Every worker signs the induction sheet and collects a numbered helmet before entering.
Zero lathing cases · zero lost-time injuries
Helmets are counted at the gate, scaffolding is signed off before the first mason climbs, and every near-miss is logged the same evening.
Section A–A · column grid 5×4
Drawing sheet
Safer by choice
Daily gate routine
Every worker signs the induction sheet and collects a numbered helmet before entering.
A supervisor initials each lift of scaffolding; no initial, no climb.
Ten minutes on the day's lift plan, in Nepali, with the crew that will actually do it.
Anything that almost happened is written down before the crew leaves, not after an accident.
Committee notes
First site on this lane to fence the spoil pile and wash the trucks before they hit the blacktop.
“Worked through the holidays, locked the site every evening, and left the playground cleaner than they found it.”
“The supervisor knocked on our door before the piling started. That is the whole review.”
Safety desk
Our site log, induction sheets and scaffold sign-offs are available to any client, neighbour or ward office that asks.
Survey request
Form 7-BPlot location
Ward + street, or drop the pin on WhatsApp
Access
Road width, gate side, any river stone walls
Survey day
Amin walks Tue & Fri mornings · results same week
Rate card + steel quote arrive as one PDF