Residential
Four-anna walk-ups and family duplexes, finished to the snag list we hand you at handover.
18 projects
31 buildings · 9 wards · one ledger
Thirty-one buildings with steel test dossiers QR-pinned per pour — walk any street on this list and the committee will point at our slab.
Section A–A · column grid 5×4
Drawing sheet
Site ledger
Sectors we build in
Four-anna walk-ups and family duplexes, finished to the snag list we hand you at handover.
18 projects
School blocks poured in the vacation window so no term is lost to shutters.
4 projects
Clinics with lead-lined imaging rooms, medical gas lines and infection-control finishes.
3 projects
Office shells with parking pits, service cores and lifts sized for the tenant, not the brochure.
3 projects
Interior packages from bare shell to keys, one supervisor and one invoice.
2 projects
Retaining walls, access roads and drainage that survive a monsoon, not just an inspection.
1 project
Owner's minutes
Steel test dossier had QR codes for every pour. My bank laughed because it had never seen one.
Title checked thrice, amin walked twice; the gate diary was the cleanest I've signed.
One supervisor, one invoice, and calls answered at 8:40pm on a Tuesday.
Projects desk
Name the street or the committee; we hand over the Pour & Cure ledger for that building — cube-test results included, unedited.
Survey request
Form 7-BPlot location
Ward + street, or drop the pin on WhatsApp
Access
Road width, gate side, any river stone walls
Survey day
Amin walks Tue & Fri mornings · results same week
Rate card + steel quote arrive as one PDF