PANA
TemplatesPricingTry itHow it worksAboutFAQ
Log inTry PANA
← BackNirmanConstruction
HomeProjectsPlotsCapabilitiesSafetyCareersWho we are
desktoptabletmobile
Use this template
Layouts
NavbarHeroServicesProcessGalleryPricingTestimonialsContactFooter
Big typeMinimal centered
⌂NIRMANBuilders · Plotters · Est. 1996
StreamsSitesPour scheduleRate cardHomeProjectsPlotsCapabilitiesSafetyCareersWho we are
Book survey

Zero lathing cases · zero lost-time injuries

Safety is a schedule item, not a sticker

Helmets are counted at the gate, scaffolding is signed off before the first mason climbs, and every near-miss is logged the same evening.

Read the log
01 — Lost-time injuries
0
02 — Induction rate
100%
03 — Near-miss review
24h
SLAB LAYOUT · REV C1:200 · A1

Section A–A · column grid 5×4

Drawing sheet

◀ Safer by choice

Daily gate routine

What happens before 7am

01SPT + mill certs

Gate induction

Every worker signs the induction sheet and collects a numbered helmet before entering.

02alignment signed

Scaffold sign-off

A supervisor initials each lift of scaffolding; no initial, no climb.

03cube tests 7/28d

Toolbox talk

Ten minutes on the day's lift plan, in Nepali, with the crew that will actually do it.

04stage bill QR

Near-miss log

Anything that almost happened is written down before the crew leaves, not after an accident.

Committee notes

“
First site on this lane to fence the spoil pile and wash the trucks before they hit the blacktop.
Ward 16 committee · Sunakothi
“Worked through the holidays, locked the site every evening, and left the playground cleaner than they found it.”
School management · Jhamsikhel
“The supervisor knocked on our door before the piling started. That is the whole review.”
Neighbour, Baluwatar · North lane

Safety desk

Ask for the log

Our site log, induction sheets and scaffold sign-offs are available to any client, neighbour or ward office that asks.

Field desk
01-4351420
Yard
Gongabu depot yard, Kathmandu
Desk mail
[email protected]

Survey request

Form 7-B
01

Plot location

Ward + street, or drop the pin on WhatsApp

02

Access

Road width, gate side, any river stone walls

03

Survey day

Amin walks Tue & Fri mornings · results same week

Call the field desk

Rate card + steel quote arrive as one PDF

⌂NIRMAN

Field desk 6am–5pm · sampling from the gate diary
HomeProjectsPlotsCapabilitiesSafety

■ 31 buildings stamped · 0 lathing cases

2026 Nirman Builders

Pana By DMK Group