Title trace
Three separate reads of the deed, the plot map and the municipal record before a figure is quoted.
SPT + mill certsAmin walks Tue & Fri mornings
Parcels read twice by the amin, verified once more by licensees, gate diary handed over personally — the rate card pins before every pour.
Section A–A · column grid 5×4
Drawing sheet
Partition desk
Plot rate card
Rs. 42Lentry
Standard 136 sq ft parcel with road frontage and boundary pillars.
Rs. 78Lcorner
Two-road corner with wider frontage and a ready drainage line.
Rs. 2.9kper sq ft
Buy the parcel and we carry it from plinth to handover under one ledger.
Partition process
Three separate reads of the deed, the plot map and the municipal record before a figure is quoted.
SPT + mill certsBoundary pillars marked with the amin on a Tuesday or Friday morning, neighbours present.
alignment signedLicensed surveyor draws the partition; you sign at the ward office, not in a car park.
cube tests 7/28dYou leave with the gate diary, utility letters and a phone number for every next step.
stage bill QRRate lock window
Rate card pins quarterly. Book before the pour date and the steel rate holds — no mid-build renegotiation.
Book survey
WhatsApp the plot location; survey with the amin runs the same week and the rate card arrives as one PDF, no phone-menu detour.
Survey request
Form 7-BPlot location
Ward + street, or drop the pin on WhatsApp
Access
Road width, gate side, any river stone walls
Survey day
Amin walks Tue & Fri mornings · results same week
Rate card + steel quote arrive as one PDF