PANA
TemplatesPricingTry itHow it worksAboutFAQ
Log inTry PANA
← BackNirmanConstruction
HomeProjectsPlotsCapabilitiesSafetyCareersWho we are
desktoptabletmobile
Use this template
Layouts
NavbarHeroServicesProcessGalleryPricingTestimonialsContactFooter
Title blockGraphing sheet
⌂NIRMANBuilders · Plotters · Est. 1996
StreamsSitesPour scheduleRate cardHomeProjectsPlotsCapabilitiesSafetyCareersWho we are
Book survey

Amin walks Tue & Fri mornings

Four-anna plots, titles checked thrice

Parcels read twice by the amin, verified once more by licensees, gate diary handed over personally — the rate card pins before every pour.

Walk the plots
01 — Standard parcel
4-anna
02 — Entry rate
42L
03 — Title checks
3×
SLAB LAYOUT · REV C1:200 · A1

Section A–A · column grid 5×4

Drawing sheet

◀ Partition desk

Plot rate card

Parcels priced on the sheet

4-anna parcel

01

Rs. 42Lentry

Standard 136 sq ft parcel with road frontage and boundary pillars.

  • ■Three title checks
  • ■Amin walk included
  • ■Gate diary handed over
Book plot survey
Most booked

8-anna corner

02

Rs. 78Lcorner

Two-road corner with wider frontage and a ready drainage line.

  • ■Corner premium fixed
  • ■Drainage to municipal line
  • ■Rates locked quarterly
Book plot survey

Turnkey plot + build

03

Rs. 2.9kper sq ft

Buy the parcel and we carry it from plinth to handover under one ledger.

  • ■Locked steel rate
  • ■Stage-billed payments
  • ■Snag cover for a year
Book plot survey

Partition process

How a parcel changes hands

01

Title trace

Three separate reads of the deed, the plot map and the municipal record before a figure is quoted.

SPT + mill certs
02

Amin walk

Boundary pillars marked with the amin on a Tuesday or Friday morning, neighbours present.

alignment signed
03

Partition deed

Licensed surveyor draws the partition; you sign at the ward office, not in a car park.

cube tests 7/28d
04

Gate diary

You leave with the gate diary, utility letters and a phone number for every next step.

stage bill QR

Rate lock window

Rate card pins quarterly. Book before the pour date and the steel rate holds — no mid-build renegotiation.

Rate lock ends · soonBook plot

Book survey

Book the partition desk

WhatsApp the plot location; survey with the amin runs the same week and the rate card arrives as one PDF, no phone-menu detour.

Field desk
01-4351420
Yard
Gongabu depot yard, Kathmandu
Desk mail
[email protected]

Survey request

Form 7-B
01

Plot location

Ward + street, or drop the pin on WhatsApp

02

Access

Road width, gate side, any river stone walls

03

Survey day

Amin walks Tue & Fri mornings · results same week

Call the field desk

Rate card + steel quote arrive as one PDF

⌂NIRMAN

Field desk 6am–5pm · sampling from the gate diary
HomeProjectsPlotsCapabilitiesSafety

■ 31 buildings stamped · 0 lathing cases

2026 Nirman Builders

Pana By DMK Group