Test before you trust
Soil, steel and concrete are tested before they are covered up. The dossier belongs to the owner.
Since 1996
Est. 1996 · Gongabu depot yard
Three decades of frames, plots and finish work around Kathmandu — run from a yard where the gate diary is still the first thing you see.
Plan · level 03
Principles
Soil, steel and concrete are tested before they are covered up. The dossier belongs to the owner.
Since 1996
A building gets a name, not a rotating queue. That person answers the phone after hours.
On every site
The rate card locks quarterly so a pour date cannot become a negotiation.
Signed up front
Spoil fenced, trucks washed, neighbours told before the piling starts.
Gate rule
Owners, not clients
Six years on, the terrace still drains. That is the review.
They handed over the plot file with every letter already stamped. I only had to sign.
The same supervisor who poured the slab came back to fix a hinge. No invoice.
Field desk
Gate open 6am–5pm, Saturday till noon. Bring the plot number, or just come and look at the test files.
Survey request
Form 7-BPlot location
Ward + street, or drop the pin on WhatsApp
Access
Road width, gate side, any river stone walls
Survey day
Amin walks Tue & Fri mornings · results same week
Rate card + steel quote arrive as one PDF